The City of Mont Belvieu owns, operates, and maintains the Cotton Bayou Wastewater Treatment Plant located on Perry Avenuenue. The plant was opened in 1980 and was expanded in 1998 to its current capacity. The capacity of the plant is 1.5 million gallons per day on average on a monthly basis. The peak capacity is 4.5 million gallons per day which is the maximum on any given day.
The City of Mont Belvieu owns, operates, and maintains 10 sanitary sewer lift stations. The lift stations are located in all parts of the city. The collection system also includes 65 miles of sanitary sewer collection lines and sewer force mains. These lines range in size from 4 inches to 48 inches.
Click here to view the City of Mont Belvieu's TCEQ Wastewater Permit Application.
Click here to view the City of Mont Belvieu's TCEQ Wasterwater Draft Amended Permit.
Director of Public Works
281-576-2213 x2152
Email Bill
Public Works Office Manager
281-576-2213 x2351
Email Sharon
Water & Wastewater Manager
281-576-2213 x2352
Email Royce